Care should be taken when unloading and storing all materials by maintaining wrapping and any other protective coverings on the products. This has been placed onto the products to protect them until use. All insulation components must be cut to provide (once fitted to the relevant element) full and tight to the edge coverage. All plane junctions formed by the
installation of plasterboard must be sealed, to each other or an appropriate solid substrate, with the high mortality sealant.

Where internal element faces are not insulated, the plane junctions must still be sealed to provide air tightness to the whole of the room, as far as practical.

Similarly, all component penetrations must be made airtight by the application of the sealant.

Installers should determine the location of any services behind internal surfaces receiving Green IWI components (prior to any penetrative works) using a multi detector (including live wire sensors) to ensure that pipes and wires are not compromised by fixing the timber studs. We always recommend using a suitably qualified individual at this point.

Pre-Design Survey
Refer to your copy of the pre-design survey prior to the commencement of and during all works. The survey should be completed by a suitably qualified individual, trained to complete the survey.

Risk Assessment
Installers should have a copy of an appropriate risk assessment completed at the point of survey and be fully aware of and be able to reduce any risks indicated.
Should any other risk present itself on the day of installation, Installers must assess the risk and take the necessary steps to reduce the risk to an acceptable level

Required tools
As an example, but this list is for guidance only. Each site is different.

  • Hand Tools
  • Battery operated drills / drivers and cutting equipment
  • Plastering tools
  • Access equipment
  • Access platforms
  • Harness and safety equipment and training required
  • Personal protective equipment
  • Suitable Dust masks
  • Dust suits
  • Safety Goggles
  • Hearing protection
  • Hard hat
  • Hi-Vis
  • Safety Boots