Preparation
The first thing to note is preparation of the property.
Please Note
We are assuming the property is fit to receive IWI and has no damp or any issues with the Damp Proof course (this must be in place to fit IWI)
Ensure that the wall the insulation is free from wallpaper, any signs of condensation and any indications that damp may be present. If there is wallpaper present, please make sure it is removed before adding insulation to a wall. Try to avoid using steam to remove wallpaper as that can add condensation to a room, if steam is required to remove the wallpaper, then please leave for one to two days before applying insulation to ensure the insulation does not trap any condensation. If there is a painted wall, again try to scratch the surface
of the wall which again allows the insulation to be placed against the original plaster rather than a coat of paint at all points. 100% coverage of all outer walls must be ensured, thus avoiding any risk of cold bridging.
No parge coat is required on any wall prior to the installation of the Ezy-Fit Green IWI system however the wall must be dry and free from any damp or risk of damp.
Remove all curtains, radiators, and electrical outlet fronts, ensuring that these are removed by a professional who can disconnect services from them first and make it safe to work in that area.
Ensure the system is above a working damp proof course. Should you be required to insulate below ground level please speak to a qualified individual who can help with the design of this space.
Plan the installation of all timber studs so that you are avoiding any risk of drilling through embedded electricity cables or pipes. Ensure surface mounted services have been checked by a suitably competent person to ensure adding the insulation will not compromise safety and their performance. If required, reroute electrical services to on top of the
insulation should this be requested by a suitably qualified individual. Always ensure services are safe to work near or around before any work commences.
At this point should the work area be thoroughly prepared you can focus on adding the insulation to the walls. This preparation would also include the marking position of any pattress boxes so that not covered by timber studs.
Care shall be taken in the overall design and construction of junctions with other elements and openings to ensure a 100% coverage of outer walls is maintained with the installation of the system.