Method 1
1- Installing an airtight vapour control membrane across the loft floor area will eliminate draughts and safely control the amount of water vapour entering the loft. The membrane should be draped between each set of joists and all overlaps should be taped. Thin strips of hardboard or a similar material can be added at the bottom of the joists and stapled every 100-150mm to hold the membrane tight at the corners for an easier installation.

These strips make it easy to pull the membrane taut without tearing it. Any penetrations through the loft floor that penetrate the membrane should also be taped and sealed. Taping the membrane to the perimeter walls and around the loft hatch is recommended to create a higher level of airtightness and draught prevention.

Once the insulation slab is in position, measure the width of slab you need to fit between the joists; this tends to be either 400mm or 600mm. Then, cut the slab to size using a specilised insulation saw. Position the crawling boards in the furthest corner of the loft. You’ll need to start laying with a minimum gap of 25mm between the eaves and the insulation to ensure a suitable air gap. Maintain this gap along two opposite sides of the loft.

Make sure that the wall plate is covered, then lay the slabs, moving backwards so you are working towards the centre of the loft to avoid putting your weight directly onto the insulation. Gently push the insulation so it fits snuggly between the joists, but don’t compress it as that will reduce its efficiency.

When you reach a cross beam, to cut the insulation to fit.

Depending on the depth of the joist, repeat the same procedure for the next 100mm slab of insulation, to fill the void. Then for the third layer to achieve the 300mm depth, cross lay the insulation slabs to fill the entire area to be insulated./image

Method 2
The airtight vapour control membrane can also be installed acoross the bottom layer of the insulation slab, level with the existing joists. Simply install the insulation slabs as previously instructed, then add the membrane across the top of these, taping and sealing to ensure the air tightness of the layer. Then simply add the next two layer’s of insulation slabs across the top.

If the airtight vapour control membrane is installed flat over the joists, airtight sealing of the perimeter at the eaves cannot be done. It is generally easier to get a timber board, cut notches for the joists and then install that up against the rafters. Them, air/vapour tightness tape should be used to seal the board to the joists, gable wall, and timber wall plate.