Generic filters
Filter by Categories
Get a quote

Guides and datasheets

Design Considerations

Avoiding Damp

Last updated August 2026

Thermal bridging occurs when the continuity of the insulation is broken, causing the inner surface of the wall at that point to become much cooler than the surface where the wall is insulated. This can often occur at the junction of a wall and separating floor. Thermal bridging can cause an increase in heat loss, surface condensation and mould growth and can often be a problem in terraced houses.

Surface condensation
Occurs when water vapour in the air cools and condenses (reverts to liquid form) as it comes into contact with colder surfaces. Reducing the amount of water vapour in the air by extracting moist air from kitchens and bathrooms and increasing the surface temperature will prevent condensation forming on the internal surface of solid external walls. The installation of the Ezy Fit K Insulated system will raise the surface temperature of the walls to a level whereby condensation will not form under usual maximum humidity conditions experienced in dwellings.

Combustion appliances
It is imperative that ventilation requirements of gas, oil or coal fired combustion appliances are not compromised by the installation of Ezy Fit K Insulated system and that the system does not interfere with the supply of fresh air to the appliance. Recommendations, guidance, and compliance to building regulations for the ventilation of combustion appliances can be found in building regulations and must be adhered to.

Damp Proof Couse (DPC)
The Ezy Fit K Insulated System should always be installed above a working damp proof course. In no way should the system compromise or bridge a DPC as this will lead to greater problems at a later date. We always recommend an injection DPC if no DPC is in place or if the DPC is compromised and cannot be rectified with standard building methods

Party Walls
Thermal Junctions can occur when insulation is not continuous. A party or adjoining wall is an area that can create a thermal junction. Whilst returning the insulation on a party wall can mitigate the thermal bridging, care must be taken if insulating along a cold party wall which could in theory make the wall colder and increase the risk of cold or damp that is already there if the neighbour’s property is not heated or correctly ventilated.

Before installing the Ezy Fit K System, always ensure that a comprehensive survey has taken place which also evaluates the outer surface of the external wall as well as the soundness of the structure, efficiency of guttering and avoidance of application to damp or poorly ventilated properties.

Ezy Fit can provide to all our K System trained customers, a free of charge, fast tracked service direct to Kingspan for their U value & interstitial condensation risk calculation. But please note, Ezy Fit do not review, give advice or recommendations on the individual property, this is for the installing companies Retrofit team to confirm the property suitability for the K System.

U-value calculations must be performed in accordance with BS EN ISO 6946: 2017, using a method known as the ‘Combined Method’. Calculations should also be carried out in strict accordance with the guidance issued in BR 443: 2006 ‘Conventions for U-value calculations’ and should be undertaken by competent persons.