Generic filters
Filter by Categories
Get a quote

Guides and datasheets

Installation – Bonding Method

Installation – Batten Method

Last updated August 2026

  • Timber battens are fixed around the perimeter of the wall, openings and services, then vertically at maximum 600mm centres.
  • All timbers are screwed over the DPC, to the substrate using appropriate fixings. Fixings are made approximately 75mm from the ends and positioned at not more than 600mm centres
  • Timber battens must provide a minimum 19mm bearings to support the board edge when installed.

Each sheet of board should be lightly butted, with fixing’s no more than 10mm from the edges and at 300mm centres or 200mm at external corners.

The board is cut approximately 5mm short of the floor to ceiling height, then located centrally over the timber battens.

The perimeter of the K boards, corner joints and the 5mm gap at the bottom should be sealed with an acrylic sealant.

Services
Positions for all new services should be determined. Existing services should be assessed for any alterations that may need to be made, for example, relocating sockets and switches.

Services can be incorporated behind the dry lining, making the chasing of the wall unnecessary. But, where the services have a greater depth that of the void, the wall should be chased rather than the insulation.

Consider installing access hatches where removal of the system may pose a problem in the future