Step 1
A distance of 10 mm plus the thickness of the insulation board must be allowed away from the wall’s high point and a line must be drawn across the floor. It must then be plumbed for alignment before transferring the line to the ceiling, extending to the room corners. A mark must be made on the walls at 1200 mm centres to indicate the insulation boards positioning

Step 2
A band of adhesive is applied around the perimeter, services, and openings. The adhesive must be approximately 25 mm in from the edge, to avoid bridging the joint.

Step 3
A full, continuous bed of adhesive (not dot and dab) is then applied.

Step 4
Insulation boards are cut approximately 15 mm short of the floor to ceiling height The boards are taped into position and supported by packers until the adhesive is set.

Step 5
Once the adhesive sets (generally 1.5 to 3 hours), a minimum of 6 appropriate fixings per sheet are added and positioned no less than 15 mm in from the edges. Fixings should be selected to provide a 25 mm penetration into the masonry wall.

Additional Installation Procedures:

  • Flexible polyurethane foam and/or flexible sealant or equivalent must be applied around the perimeter of the system where the board abuts adjacent surfaces, window/door frames, ceilings and floors.
  • Window or door reveals should be insulated with a minimum thickness of 32.5mm
  • At external angles, the system should be extended past the corner and the insulation cut back
  • Where required, additional bands of adhesive, horizontal fixing T’s, fixing straps, metal tracks/lining channels on timber noggins are placed to support unsupported board edges.
  • For medium to heavy weight wall-mounted fittings, appropriate fixings are used to fix through the system into the masonry or timber noggins, steel fixing straps or plywood patressing.

Picture rails and Dado Rails
These can be fixed back onto the plastered finish with either silicon or Grab adhesive.