Stud Wall
- Where necessary, access hatches into the loft space may be formed, allowing ingress. Perform a manual search of the surrounding area to ensure it is free from obstruction.
- Ensure the frame is sealed to the plasterboard with MI SEAL and that any supporting timbers are insulated with MI BRIDGE.
- Cut 20mm MI BRIDGE strips to length, allowing for a 50mm overlap on either side of the exposed timber stud work heads.
- Fix MI BRIDGE into place using suitable fixings, at 400mm centres. Ensure any other exposed timbers such as purlin heads where present, are also insulated with MI BRIDGE to prevent any cold bridging.
- MI STUD can then be friction fitted between the vertical stud work members.
- To ensure the element is airtight following insulation, the stud work wall must be sealed to the floor from within the roof room with MI SEAL.