Pitched Roof
Prior to fixing MI BOARD into place, disable any existing vapour barrier present in the existing slope covering.
- Establish the location of rafters to ensure correct fixing alignment of MI BOARD sections.
- Fix each board to the existing sloping ceiling, penetrating the rafters by a minimum of 50mm and a maximum 100mm from the board edges.
- Ensure all edges and joins of MI Board are sealed with MI Seal.
- If working to BEIS, apply a full skim coat of plaster to the extent of the sloping ceilings.