Residual Loft Space
Where residual loft spaces exist and can be accessed through existing or newly formed hatches in the studwork dwarf walls. A visual inspection of the areas should be carried out to check for the presence of either downlighters or high amperage cables, supplying cookers or electric showers
Should downlighters be present, these must be covered with fire rated downlighter covers, themselves then covered with a minimum of 200mm MI ROLL Where high amperage cables are present, these must not be covered by insulation and should be left in position upon the top layer of insulation.
An assessment of the existing loft insulation depth (if any) should be made.
- MI ROLL should then be laid to an overall depth of not less than 300mm to all horizontal areas within the roof space, cross-laid to ensure joist heads are covered by the top layer of insulation.
- Any other exposed horizontal timbers such as purlins should also be covered to prevent cold bridging, and the insulation should be closely butted to the MI STUD insulation friction fitted between the studwork dwarf wall frame.
It is essential that the eaves of the roof space are adequately ventilated to prevent moisture build up and condensation. Having assessed the ventilation at survey stage, the installer should follow the recommendation of the survey and install, where necessary and required, the appropriate ventilation system.
Any exposed pipework or water storage tanks must be insulated.